Real project · 2017–2018
From the red underfloor-heating panels to the finished plant room: a year of work told in real photos we took as we went.
No-obligation quote · Same-day reply · We assist you in English, Spanish and German
Chapter 1
The whole floor plan got underfloor heating: circuits balanced room by room and a 7-circuit manifold.
Every room gets its own circuit, routed to spread heat without cold spots.
The pipe traces the room's geometry before disappearing.
Every circuit leaves pressure-tested before the screed.
Chapter 2
The best installation is the one you never see: the screed covers the circuits and the house is ready for any flooring.
Freshly laid circuits on the studded panel.
Days later: the screed covers the work for good.
The exact border between what we install and what you see.
Chapter 3
Heat pump, hot-water storage, water softener and buffer tank — mounted, insulated and arranged to last decades.
The indoor unit open: pump, copper and valves in view.
Every line identifiable, every valve reachable.
Cylinder, softener and buffer: insulated and in order.
Chapter 4
Ducted air: the machine lives in the false ceiling and all that's left on the wall is a thermostat.
Hung from the slab and insulated before the ceiling closed.
The lines arrive clean at the unit.
Of the whole installation, this is all the client touches.
The result
Double-height spaces, a sculptural staircase and not a machine in sight. Finished in 2018, running ever since — and we still do the maintenance.
Light, volume and underfloor heating underfoot.
The architectural detail that crowns the build.
The same floor you saw in red, now invisible.
On its own it provides heat. Combined with an air-source heat pump it can gently cool the floor, and in this house the real summer cooling comes from the ducted air hidden in the false ceiling. A single technical room covers comfort all year round.
Yes, as in this project: the circuits are laid over a studded panel and covered with a mortar screed; any flooring then goes on top. The key is to allow for the height of that screed when planning the renovation, so it is worth discussing before the work starts.
We keep maintaining it ourselves. This house was finished in 2018 and has been running ever since with our maintenance. As an RITE-registered company, we leave the installation legalised and follow it up year after year.