Renewable energy · Mallorca · Since 1998
Mallorca's sunshine,
working for your home.
We're Joaquín and Juan, two partners, one team. We install solar panels, heat pumps (aerotermia) and self-consumption systems. If a grant call is open, we file the application with your authorisation, and we give you the paperwork for the income-tax (IRPF) deduction. Plus everything else in your home: air conditioning, plumbing and electrics. Authorised low-voltage installer for solar and electrics, and RITE-licensed for air conditioning and heat pumps: installation, legal paperwork and maintenance.
- 5.0 · Google rating · 10 reviews
- Send us photos and details
- Reply within 24-48 hours on working days
- We'll help you in English, Spanish and German
Real installation · Llucmajor
Since 1998, two partners installing Mallorca's energy. No subcontractors. No surprises.
- Low voltage (REBT): solar, electrics and EV chargers
- RITE: air conditioning and heat pumps · F-gas: refrigerant circuit only
- Installation + certification + grants
- We assist in Spanish, English and German
- 1
Tell us about your project
Call, WhatsApp or form. In your language.
- 2
Survey and fixed quote
What you sign is what you pay for that job; any extra, in writing and beforehand.
- 3
We install and legalise
Certificates filed. If a grant call is open, we file the application with your authorisation, and we give you the paperwork for the income-tax (IRPF) deduction.
On site
Music: “Corporation Motivation” by Jason Shaw · audionautix.com · CC BY 4.0
What we do
Renewables and much more
Specialists in solar power and heat pumps, with the whole installation handled by a single team.
- Grant managementIf a grant call is open, we file the application with your authorisation; we prepare the technical paperwork for municipal rebates and give you the paperwork for the income-tax (IRPF) deduction.
- Air conditioningUnderfloor heating, ducted and multi-split systems. Thermal load calculation and equipment to suit the real space (RITE), with the installation certificate registered with the electronic office of the Govern de les Illes Balears.Air conditioning in Mallorca
- Ventilation & heat recoveryAir constantly renewed and filtered; the heat-recovery unit reuses the warmth of the outgoing air so no energy is wasted. No damp, no condensation.Ventilation in Mallorca
- Electrical workPanels, circuits, earthing and certificates, as a licensed low-voltage installer (REBT).Electrician in Mallorca
- EV chargerCharge your car at home and, if you have solar panels, with your own sun. Certified as low-voltage work, with the paperwork ready for the IRPF deduction.EV charger in Mallorca
- Home automationLighting, climate, blinds and your solar self-consumption from your phone, in one system.
- PlumbingHot and cold water, pressure sets, well and borehole pumps, and water softening.Plumber in Mallorca
- Water treatmentWater softeners against limescale in the whole house, reverse osmosis for drinking and well or cistern water, with your network's official hardness.Water treatment in Mallorca
- DrainageNew drainage: downpipes, rainwater and total-oxidation treatment plants for homes off the sewer.Drainage in Mallorca
- JSL Villa CareAnnual maintenance service for international property owners: installation checks, seasonal opening and closing, and fast response to incidents. Your Mallorca villa, always ready.Villa maintenance service
Seasonal offers
Two good reasons to take the step
No small print: what you see is what we do.
Solar PV
Turnkey solar self-consumption
- Savings study from your photos and details
- If a grant call is open, we file the application with your authorisation, and we give you the paperwork for the income-tax (IRPF) deduction
- Panels, batteries and legalisation with Industria
Climate · all year round
Air conditioning & aerothermal
- Fixed quote from your photos and details
- Certified for fluorinated gases (any charge)
- Installed to RITE, with the 3-year legal guarantee on the equipment
* Survey and itemised quote. Grants and deductions depend on the current call; we tell you which apply to your case.
Estimate your savings
How much can you save with solar panels?
Slide your average monthly electricity bill and get an instant estimate.
- kg of CO₂/year avoided (Balearic electricity mix, Govern 2024) · equivalent to planting - trees (a mature tree, per the European Environment Agency)
* Rough estimate: it assumes self-consumption covers half of your bill; the real figure we work out from your consumption and the PVGIS output for your roof. Indicative 25-year projection, not counting tariff rises or panel degradation: it is the first year's saving times 25. Send us your bills and we'll calculate it exactly.
No paperwork for you
Grants and subsidies, handled
Renewables often come with grants. If a call is open, we file and justify the application with your authorisation; you sign it and the grant is paid into your bank account.
The FOTOPAR 2026 call for solar panels closed on 30 April 2026. The income-tax (IRPF) deductions remain. FACTOR 2026, the grant for heat pumps, batteries and EV chargers, closed on 17 October 2026 when the funds ran out. We will tell you which ones apply to your case.
Watch the dates: the income-tax (IRPF) deductions for self-consumption (additional provision 62) and for efficiency works (additional provision 50, the 20 % and 40 % rates) are for installations finished and paid by 31 December 2026, and FOTOPAR 2027 is applied for between 26 January and 30 April 2027, before work starts. So for an installation contracted now you usually choose: finish it in 2026 with the deduction, or wait until 2027 to apply for FOTOPAR. If you can, finishing it in 2026 is usually the better choice: the deduction has a deadline and FOTOPAR 2027 has little funding (2 million euros for the whole of the Balearics).
If you are not resident in Spain (you pay non-resident income tax, IRNR), these IRPF deductions generally do not apply to you: check with your tax adviser.
- 1
Photos and details
You send us photos and details by WhatsApp or email; with them we analyse your consumption and your home and work out your savings and the grants you can apply for. If we need to see it, we come.
- 2
Install & certify
We carry out the installation and legalise it with the authorities, with all the documentation.
- 3
Paperwork and grants
We give you the invoices and the installation certificate for the income-tax (IRPF) deduction. For the energy-efficiency deduction, the two energy performance certificates (one before and one after the works) are signed by a qualified technician and, if you wish, we arrange them for you. If a grant call is open, we file the application and its supporting documents with your authorisation; you sign it and the grant is paid into your bank account.
What documents do we need to process your grants?
Solar PV (Self-Consumption)
- DNI/NIE of the property owner.
- Last electricity bill (to prove your energy savings).
- Property cadastral reference (IBI tax receipt).
Heat Pumps & Underfloor Heating
- DNI/NIE of the installation holder.
- Property cadastral reference.
- Energy Efficiency Certificate (CEE) prior to the works.
We take care of the paperwork!
Got the documents ready? Leave the rest to us
Send us photos and details on WhatsApp and we'll reply within 24-48 hours on working days and prepare your savings study and a fixed-price quote.
Direct contact, tradesperson to tradesperson, in Mallorca
See all the grants for solar panels in Mallorca →
* Grants, deductions and rebates depend on each call and the relevant authority in force, and on the applicant and property meeting the requirements (up to date with payments, legalised property registered in the cadastre, etc.). The award is decided by the authorities: we manage and file the application, but we do not guarantee that any grant will be obtained. We tell you which are available in your case.
About us
Renewable energy, properly installed, for decades.
We're Joaquín and Juan, two partners working together since 1998. JSL is our Mallorcan company, specialised in renewable energy: solar PV and heat pumps. We combine real hands-on trade with proper engineering: every installation starts from a real survey and a quote itemised line by line.
We are an authorised low-voltage installer (REBT) for solar and electrics, a RITE-licensed thermal installer for air conditioning and heat pumps, and certified to handle fluorinated gases in the refrigerant circuit. We work to the regulations in force (CTE, REBT, RITE) and we take care of the whole thing: design, installation, legalisation and the maintenance afterwards.
- 28
- Years in the trade · since 1998
- 5.0
- Google rating · 10 reviews
- 3
- Licences: low voltage (solar and electrics), RITE (heat pumps and air conditioning) and fluorinated gases (refrigerant circuit)
- ES·EN·DE
- We speak your language
- Savings study and transparent quote
- Installation, certification and grant management
- Authorised for low voltage (solar and electrics) and RITE (heat pumps and air conditioning)
- Listed in the REA (Register of Accredited Construction Companies) no. 04/01/0010572
- Warranty and after-sales maintenance
Quality
Brands we know and install
We work with most manufacturers on the market, but these are the ones we install most: equipment we trust and have been fitting here in Mallorca for years.
How we work
How we do things at JSL
At JSL we don't just bolt units to the wall, we build installations to last. Every project starts from a real engineering calculation and gets legalised with the authorities, with its certificate and paperwork, because getting it right today saves you a headache tomorrow.
We work with top brands (Fronius, Victron, DAITSU, Fujitsu, Schneider…), the same ones we've been fitting in Mallorca for years, and we handle everything with one team: survey, installation, legalisation and your grant paperwork. You decide; we take care of the rest.
One detail that says a lot about how we work: we use top professional tools (Testo calibrated instruments, Bosch and Milwaukee on site) and every maintenance visit ends with a digital report with photos and readings. It is not for show: it means we can show you exactly what we checked in your installation.
- Testo · calibrated instruments
- Bosch · on site
- Milwaukee · on site
- Digital report after every visit
Clean energy
Every installation makes Mallorca greener
Switching to solar self-consumption and heat pumps doesn't just save you money: it cuts emissions and frees you from fossil fuels.
Less CO₂
Every solar kWh you use avoids the emissions that the same energy would generate if taken from the grid.
100% renewable energy
Mallorca's sun: a clean, free and inexhaustible source all year round.
Goodbye gas and oil
Heat pumps replace fossil-fuel boilers with an efficient, quiet heat pump.
A more sustainable home
You improve your home's energy efficiency and increase its long-term value.
Why choose JSL
Technical guarantees and fixed-price quotes
We remove surprises: a fixed-price quote and careful work down to every screw, cable, and pipe.
Fixed-price quote, no surprises
We calculate and study the drawings in detail. What you sign is what you pay for that job. If something turns up that could not be seen, or you want to add something, we quote it in writing before doing it.
Legal Guarantee & Authorised Installer
We are an authorised installer: low voltage (REBT) for solar and electrics, and RITE for air conditioning and heat pumps. Every installation is handed over legalised. The equipment we supply and install carries the 3-year legal guarantee for lack of conformity (arts. 115 quater and 120 of the Spanish Consumer Act), plus the official manufacturer's warranty on each unit.
You deal with us directly, no middlemen
No call centres, no outside sales reps. You deal directly with Joaquín and Juan, who are responsible for your installation in Mallorca.
Recent work
Projects
A sample of recent installations.
See our projects in full: Casa Llucmajor · Finca Campos · Villa Port d'Andratx
Customer reviews
What they say about JSL
Real reviews from our customers, verified on Google.
“They installed air conditioning, a water softener and a water filter in our home. A flawless installation and a very good price considering the high quality of the units.”
“The fitters worked very cleanly and very quickly. We are very happy and can only recommend JSL Mallorca.”
“They are great professionals, they advise you on the best technical solutions, they guide you through the process and then the work is done with a really good finish…”
“Very quick and efficient with all the paperwork and the maintenance contract. Very clear explanations and excellent service.”
“A great professional and a great team.”
“They installed a pressure pump and now the water comes out much stronger throughout the house.”
“Joaquín and Juan are true professionals… we highly recommend them without hesitation.”
“A very good company, work done with great responsibility, serious people.”
“They are very responsible and professional.”
“Great professionals!”
And this is what customers write when we finish, as they sign the job report.
… or leave it right here, we'll read it ourselves.
Where we work
All over Mallorca, town by town
Pick your area and go straight to the page for your town and the service you need.
North · Pollença, Port de Pollença, Alcúdia, Port d'Alcúdia, Sa Pobla, Muro, Santa Margalida, Can Picafort, Campanet
Pollença · solar panels · heat pumps · air conditioning · sewage treatment plants · EV charger installation
Port de Pollença · solar panels · heat pumps · air conditioning
Alcúdia · solar panels · heat pumps · air conditioning · sewage treatment plants · water softeners · EV charger installation
Port d'Alcúdia · solar panels · heat pumps · air conditioning
Sa Pobla · solar panels · heat pumps · air conditioning · sewage treatment plants
Muro · solar panels · heat pumps · air conditioning · sewage treatment plants
Santa Margalida · solar panels · heat pumps · air conditioning · sewage treatment plants · water softeners
Can Picafort · solar panels · heat pumps · air conditioning
Campanet · solar panels · heat pumps · air conditioning · sewage treatment plants
East coast · Manacor, Porto Cristo, Calas de Mallorca, Cala Millor, Cala Ratjada, Artà, Cala Murada
Manacor · solar panels · heat pumps · air conditioning · sewage treatment plants · EV charger installation
Porto Cristo · solar panels · heat pumps · air conditioning · sewage treatment plants · water softeners
Calas de Mallorca · solar panels · heat pumps · air conditioning
Cala Millor · solar panels · heat pumps · air conditioning · sewage treatment plants · water softeners
Cala Ratjada · solar panels · heat pumps · air conditioning · sewage treatment plants
Artà · solar panels · heat pumps · air conditioning
Cala Murada · sewage treatment plants
South and south-east · Llucmajor, Campos, Ses Salines, Santanyí, Cala d'Or, Felanitx, Portocolom
Llucmajor · solar panels · heat pumps · air conditioning · sewage treatment plants · water softeners · EV charger installation
Campos · solar panels · heat pumps · air conditioning · sewage treatment plants
Ses Salines · solar panels · heat pumps · air conditioning · sewage treatment plants
Santanyí · solar panels · heat pumps · air conditioning · sewage treatment plants · water softeners · EV charger installation
Cala d'Or · solar panels · heat pumps · air conditioning · sewage treatment plants · water softeners
Felanitx · solar panels · heat pumps · air conditioning · sewage treatment plants
Portocolom · solar panels · heat pumps · air conditioning · sewage treatment plants
Palma and the south-west · Palma, Calvià, Santa Ponsa, Peguera, Andratx, Marratxí
Palma · solar panels · heat pumps · air conditioning · sewage treatment plants · water softeners · EV charger installation
Calvià · solar panels · heat pumps · air conditioning · sewage treatment plants · EV charger installation
Santa Ponsa · solar panels · heat pumps · air conditioning
Peguera · solar panels · heat pumps · air conditioning
Andratx · solar panels · heat pumps · air conditioning · sewage treatment plants · EV charger installation
Marratxí · solar panels · heat pumps · air conditioning · sewage treatment plants · water softeners · EV charger installation
Centre and Raiguer · Inca, Binissalem, Lloseta, Santa Maria del Camí, Algaida, Sineu, Petra, Porreres, Llubí, Montuïri, Vilafranca de Bonany, Sant Joan, Santa Eugènia, Maria de la Salut, Costitx, Alaró, Consell, Sencelles, Selva
Inca · solar panels · heat pumps · air conditioning · sewage treatment plants · water softeners · EV charger installation
Binissalem · solar panels · heat pumps · air conditioning · sewage treatment plants
Lloseta · solar panels · heat pumps · air conditioning · sewage treatment plants
Santa Maria del Camí · solar panels · heat pumps · air conditioning · sewage treatment plants
Algaida · solar panels · heat pumps · air conditioning · sewage treatment plants
Sineu · solar panels · heat pumps · air conditioning · sewage treatment plants
Petra · solar panels · heat pumps · air conditioning · sewage treatment plants
Porreres · solar panels · heat pumps · air conditioning · sewage treatment plants
Llubí · solar panels · heat pumps · air conditioning · sewage treatment plants
Montuïri · solar panels · heat pumps · air conditioning · sewage treatment plants
Vilafranca de Bonany · solar panels · heat pumps · air conditioning · sewage treatment plants
Sant Joan · solar panels · heat pumps · air conditioning · sewage treatment plants
Santa Eugènia · solar panels · heat pumps · air conditioning · sewage treatment plants
Maria de la Salut · solar panels · heat pumps · air conditioning · sewage treatment plants
Costitx · solar panels · heat pumps · air conditioning · sewage treatment plants
Alaró · solar panels · heat pumps · air conditioning · sewage treatment plants
Consell · solar panels · heat pumps · air conditioning · sewage treatment plants
Sencelles · solar panels · heat pumps · air conditioning · sewage treatment plants
Selva · solar panels · heat pumps · air conditioning · sewage treatment plants
Serra de Tramuntana · Sóller, Valldemossa, Bunyola, Esporles
Sóller · solar panels · heat pumps · air conditioning · sewage treatment plants
Valldemossa · solar panels · heat pumps · air conditioning · sewage treatment plants
Bunyola · solar panels · heat pumps · air conditioning · sewage treatment plants
Esporles · solar panels · heat pumps · air conditioning · sewage treatment plants
Common doubts
Frequently Asked Questions
Everything you need to know about renewable energy and climate control in Mallorca.
What solar panel subsidies are available in Mallorca?
Mallorca has several forms of support for solar panels, each with its own requirements and deadlines: national or Balearic IRPF deductions, municipal property-tax rebates and the Balearic FOTOPAR grant. FOTOPAR 2026 closed on 30 April 2026; FOTOPAR 2027 is applied for from 26 January to 30 April 2027, before work starts. Palma's current ordinance grants 25% of the IBI charge for six tax periods; Calvià grants 50% for three periods (art. 6.5 of its IBI bylaw). For other municipalities, we check the current ordinance before quoting a figure. So for an installation contracted now you usually choose: finish it in 2026 with the IRPF deduction, or wait until 2027 to apply for FOTOPAR. If you can, finishing it in 2026 is usually the better choice: the deduction has a deadline and FOTOPAR 2027 has little funding (2 million euros for the whole of the Balearics).
How do heat pumps (aerotermia) combine with solar PV panels?
Combining both technologies is highly efficient: the electricity produced by your solar panels during the day directly powers the heat pump to heat or cool your home and generate hot water, minimising your grid consumption.
What is RITE and why is it mandatory to hire a licensed company?
RITE is the Regulation for Thermal Installations in Buildings. The RITE itself requires it: air conditioning, heating and heat pump installations are carried out by licensed installation companies (art. 19.1) and maintained by licensed maintenance companies (art. 26.1). JSL is a RITE-licensed company, so the installation is legalised and its safety and efficiency are certified.
Can solar panels be installed on countryside homes off the grid in Mallorca?
Yes, we do. We install off-grid solar systems on rural estates in Mallorca, each one sized to the way you actually live. We design the system with high-efficiency panels and lithium battery storage, sized to aim for maximum autonomy and a stable supply without depending on the grid.
How much does a solar PV or heat pump installation cost?
The price depends on the size of your home and your needs, which is why we always work with a fixed-price quote after a study. A self-consumption system pays for itself through the savings on your bill; we check which grants currently apply in your case.
How long does the installation take?
Depending on the size of the job, a residential solar PV installation usually takes us 1-3 working days and a heat pump 2 to 5 days. We handle the official certification. If a grant call is open, we file and justify the application with your authorisation; you sign it and the grant is paid into your bank account. And we give you the paperwork for the income-tax (IRPF) deduction.
What maintenance do solar panels and heat pumps need?
Solar panels need very little maintenance: a periodic check and occasional cleaning. A heat pump needs the servicing set by Spain's thermal-installations regulation or, if the manufacturer asks for more, the manufacturer's. We take care of that maintenance, and the installation carries the 3-year legal guarantee plus each manufacturer's warranty.
Let's talk
Want to save with renewables?
Tell us about your case and we'll prepare a study. We reply within 24-48 hours on working days.
- Joaquín609 09 89 02
- info@jslmallorca.com
- Area
- On-site service · All of Mallorca
We reply within 24-48 hours on working days. If we don't, we'll call you.
Start saving
Send us photos and details on WhatsApp and we will have a look.
Got a breakdown? Call us and we will tell you when we can come; we reply within 24-48 hours on working days.


