Sewage treatment plants in Mallorca
Septic tank, treatment plant or holding tank, the documents and maintenance, in detail.
See the guide →Treatment plants · Porreres
Porreres' municipality covers almost 87 km² and has 763 residents in country houses (INE, Nomenclátor 2025), as well as weekend fincas, agritourism properties and wineries that the mains sewer does not reach. We are Joaquín and Juan, installers in Mallorca since 1998: we supply the new treatment plant, install it, do the electrics and prepare and sign the documents for your architect or engineer to file.
Send us photos and details · Reply within 24-48 hours on working days · We assist you in English, Spanish and German
GRAF one2clean · Image: GRAF
Your area
Two official texts deal with what lies under Porreres: the Balearic decree on nitrate-vulnerable zones and Annex 9 of the Water Plan.
The Balearic Government's Decree 18/2023 declares 42.1 km² of the municipality of Porreres, almost half, a zone vulnerable to nitrates of agricultural origin, and designates the Porreres groundwater body (1815M1), of 50.6 km². It is farmland, and fertilising is regulated.
Part of the municipality lies over the Montuïri body (1815M2), which Porreres shares with Montuïri, Algaida and Sant Joan. The Plan measures 330 mg/l of chlorides and 220 of sulphates in it from natural causes, linked to the Miocene marls.
A treatment plant with the performance the rules require, and the water reused on the plot's green area, adds no load to the aquifer and saves on irrigation. On a finca in Porreres with fruit trees or a garden, it is water you already have.
Sources: Balearic Water Plan, Royal Decree 49/2023 (regulations, art. 70, 71, 76 and 77) · Annex 9 of the Plan, entries for the groundwater body “Montuïri (1815M2)” · EN 12566 · manufacturer's manual (GRAF one2clean, as an example).
The rules here
A house that spends weeks closed needs a treatment plant that copes with no inflow: the blower keeps running and there are units that feed carbon for those periods (on the GRAF one2clean, for example, the Pack +C). If use is so seasonal that treatment is not feasible, the Plan accepts a sealed holding tank (art. 70.2.b of the Water Plan, Royal Decree 49/2023).
In agritourism one population equivalent is counted per bed space and, in restaurants and function rooms, a quarter per seat (table 12). In hospitality the grease separator is compulsory (art. 70.7.e). A winery's process water is not domestic waste water: it is studied separately with your architect or engineer.
What we do
How we work
Tell us whether it is a weekend house, a home or agritourism, the bed spaces, the location and where the water will go. We check whether it falls in the 42.1 km² of vulnerable zone.
If treatment is feasible, a treatment plant; if use is so occasional that it is not, a sealed tank (art. 70.2.b). You get the quote in writing, and your builder, how to dig the pit.
We install once the pit is ready, leave the blower running and hand you the signed documents for your engineer to file with the DGRH.
Keep learning
The general guide to treatment plants and what else we do in your area.
Septic tank, treatment plant or holding tank, the documents and maintenance, in detail.
See the guide →Self-consumption for the house, the treatment plant blower included.
See solar in Porreres →Heating and hot water with a heat pump.
See heat pumps in Porreres →Across Mallorca
Sewage treatment plants in the Pla de Mallorca: Petra · Sineu · Llubí · Algaida, or see the guide to sewage treatment plants in Mallorca →
Need the house drainage (downpipes, rainwater, chambers)? Drainage in Mallorca →
Sewage treatment plants near Porreres: Llucmajor · Campos · Felanitx
Also in Porreres: air conditioning
See our work and customer reviews on the JSL Google Maps profile →
Common questions
If treatment is feasible, a treatment plant, with the blower left running: without air the bacteria die. There are units that feed carbon while nobody is there (on the GRAF one2clean, for example, the Pack +C). If use is so occasional that it is not feasible, the Balearic Water Plan accepts a sealed holding tank (art. 70.2.b), emptied completely each time.
Almost half the municipality is: 42.1 km² according to the Balearic Government's Decree 18/2023 (BOIB no. 39 of 28-3-2023), over the Porreres groundwater body (1815M1). That declaration regulates fertilising. For the treatment plant what counts is the vulnerability of the aquifer on your plot: if it is high, denitrification and disinfection are needed (art. 70.10 of the Balearic Water Plan). We check it on the DGRH map.
With table 12 of the Balearic Water Plan (Royal Decree 49/2023): one population equivalent per bed space, one per member of staff living on the finca, a quarter for each one who does not, and a quarter per restaurant seat. In hospitality the grease separator is compulsory (art. 70.7.e), and above 12 population equivalents there is a yearly submission to the DGRH (art. 70.11).
The rules ask for it to be reused on your plot, on a green area, with 25 m² per population equivalent (art. 70.12 of the Balearic Water Plan, Royal Decree 49/2023). In Porreres, a land of fruit trees and vines, how that irrigation is distributed and over which planting we define with the manufacturer of the unit and with your architect or engineer.
Not as it stands. A winery's wash water is not domestic waste water: it carries a different load and falls under a different regime, and art. 70 of the Balearic Water Plan is designed for water comparable to domestic. For the toilets and the dwelling on the finca, yes. The process side is studied with your architect or engineer and with the water authority.
Your architect or engineer. As the installation company we prepare and sign the documentation: the declaration that the installation complies with the rules, the manufacturer's performance, the maintenance plan and the electrical certificate. With it the responsible declaration is filed with the Balearic Directorate-General for Water Resources (art. 70.4 of the Balearic Water Plan).
Quality
As an example, GRAF tanks. We propose the unit for each house and what the area requires.

Send us the location, the bed spaces, whether it is a seasonal home and a few photos of the spot. We reply within 24-48 hours on working days.