Felanitx is a municipality of small villages and country houses (S'Horta, Cas Concos, Es Carritxó, Son Negre, Son Proenç) and of coast, with Portocolom and its coves. Where the mains sewer does not reach, the house's wastewater has to be treated on the plot. We are Joaquín and Juan, installers in Mallorca since 1998: we supply the new treatment plant, fit it and prepare and sign the documents your architect or engineer asks for.
Send us photos and details · Reply within 24-48 hours on working days · We assist you in English, Spanish and German
Your area
The Balearic Islands Water Plan (RD 49/2023, art. 70) applies to the whole municipality, but inland Felanitx and its coast do not ask for the same thing.
The town and much of the countryside sit on the Sant Salvador groundwater body (1819M1), designated a nitrate vulnerable zone for agricultural nitrates (Decree 18/2023). The Balearic government also lists dozens of boreholes supplying the mains of Felanitx and its villages, each with its protection zones. So before deciding whether the water goes to irrigation or to a trench, we check the exact location of the house.
In Portocolom, the Water Plan's wetland catalogue lists the torrent des Caló d'en Marçal (code MAZH17). With 12 population equivalents or more within 500 m, prior authorisation is needed. And along the coast, the government's aquifer vulnerability map shows high vulnerability zones, where only discharge to garden is allowed and the Plan also lists denitrification and disinfection, recommended up to 12 population equivalents and required above 12 (art. 70.10, tables 13 and 14).
For a house with no mains sewer the rules only accept three solutions: an on-site treatment system, a holding tank, or natural treatment with a favourable report (art. 70.1). A cesspit is none of the three. If your house still has one, we replace it with a new treatment plant, and rainwater stays out, because it may not enter the plant (art. 70.7.d).
What we do
The paperwork
The Cala Ferrera and Cala Serena estates, next to Cala d'Or, belong to the municipality of Felanitx, as do Portocolom and Cala Marçal. For a new build on urban land with no mains sewer, the prior notice goes to the Balearic water authority, Recursos Hídrics, and it is what Felanitx town hall asks for before granting the licence (fourth transitional provision of the Balearic Urban Planning Act, Law 12/2017); from then there are two years at most to file the responsible declaration with the DGRH (art. 70.5).
The first option for the treated water is irrigating your plot, with at least 25 m² of garden per population equivalent (art. 70.12): 150 m² for a 6-bed house. We prepare and sign the technical documents as the installation company, and your architect or engineer files them.
Sources: Balearic Islands Water Plan, RD 49/2023 (art. 70, 76 and 77) · wetland catalogue, supply boreholes and aquifer vulnerability in the Balearic government IDEIB viewer · nitrate vulnerable zones (Decree 18/2023).
How we work
Photos of the cesspit or old tank, of the drain outlet and of the roof downpipes, the maximum beds, where the water will go and your email.
In the countryside, over the Sant Salvador aquifer, we check the zones around the supply wells; in Portocolom, the torrent des Caló d'en Marçal and the high vulnerability along the coast. Then a written quote.
With the pit as we indicated, we fit the new plant in place of the cesspit, start it and hand over the signed documents.
Keep learning
The full guide: septic tank or treatment plant, paperwork, treated water and maintenance.
See the guide →Self-consumption for the house; by day, the blower runs on your sun too.
See solar in Felanitx →Heating and hot water with a heat pump, with its figures and grants.
See heat pumps in Felanitx →Across the east and south
Sewage treatment plants in the east and south: Manacor · Porto Cristo · Cala d'Or · Santanyí · Campos, or see the guide to sewage treatment plants in Mallorca →
Sewage treatment plants near Felanitx: Cala Murada · Portocolom · Porreres · Vilafranca de Bonany
Also in Felanitx: air conditioning
See our work and customer reviews on the JSL Google Maps profile →
Common questions
The responsible declaration to the Direcció General de Recursos Hídrics, once the plant is installed, also below 12 population equivalents (art. 70.4 of the Balearic Islands Water Plan, RD 49/2023). It includes proof of purchase and installation, the technical specifications, the performance and the maintenance plan. We prepare and sign it as the installation company; your engineer files it.
Yes. The government publishes the boreholes supplying Felanitx and its villages in the IDEIB map viewer. Inside the strictest protection zone of one of those wells, the plant needs denitrification and disinfection (art. 70.10, table 13), and with 12 population equivalents or more inside the protection zone, prior authorisation is needed. We check it from the location before quoting.
Only with prior authorisation from the DGRH, and a drainage trench is kept for justified cases with a favourable report from the water authority. If the plot falls in high vulnerability (there are such zones along the Portocolom coast), the rules only allow discharge to garden (art. 70.10, table 13). Irrigating the garden is the usual route.
Replace it: the Balearic Water Plan only accepts a treatment plant, a holding tank or natural treatment with a favourable report (art. 70.1). We fit a new extended-aeration plant, approved to EN 12566 and CE-marked. Your builder digs the pit, to what we give in writing from the manufacturer.
No: rainwater may not enter the treatment plant (art. 70.7.d of the Water Plan). If the roof and the bathrooms drain into the same pipe at your house in Felanitx, the two networks have to be separated before the unit is fitted, because a storm would wash out the bacteria and the plant would stop treating.
Yes, the whole municipality: Felanitx, S'Horta, Cas Concos, Es Carritxó, Son Negre, Son Proenç, Portocolom, Cala Marçal, Cala Ferrera and Cala Serena. We reply within 24-48 hours on working days, in English, Spanish or German, and we fit it ourselves: we don't subcontract anyone.
Quality
As an example, GRAF tanks. We propose the unit according to the beds and the use of each house.