Sewage treatment plants in Mallorca
The full guide: septic tank or treatment plant, paperwork, treated water and maintenance.
See the guide →Sewage treatment · Santanyí
The municipality of Santanyí brings together inland villages (Santanyí, Es Llombards, Calonge, s'Alqueria Blanca), country houses and coastal spots such as Cala Figuera, Cala Santanyí or Portopetro, with a natural park in the middle. If your house has no mains sewer, the wastewater is treated on the plot. We are Joaquín and Juan, installers in Mallorca since 1998: we supply the new treatment plant, fit it and prepare and sign the documents your architect or engineer asks for.
Send us photos and details · Reply within 24-48 hours on working days · We assist you in English, Spanish and German
Your area
What changes the treatment plant of a house in Santanyí is published by the government. This is what we check.
Mondragó Natural Park (Decree 85/1992; its natural resources plan was approved by Decree 10/2022) lies in this municipality, and inside it the Water Plan's wetland catalogue lists s'Amarador (MAMT20) and s'Estany de sa Font de n'Alis (MAMT19). With 12 population equivalents or more within 500 m of either, prior authorisation from the DGRH is needed.
Further north, next to Portopetro, the Prat de Porto Petro (MAZH18) is another catalogued wetland and counts the same: a large house or guest accommodation within 500 m moves from the responsible declaration to prior authorisation, in which silence means no. And to the south-west, shared with Ses Salines, the catalogue also lists the Estany de ses Gambes (MAZH21), which counts the same.
The village sits on the Santanyí groundwater body (1820M1), designated a nitrate vulnerable zone for agricultural nitrates (Decree 18/2023), and the government lists dozens of boreholes supplying the municipal mains. There are protection zones around them: inside the strictest one, the plant includes denitrification and disinfection (art. 70.10, table 13 of the Water Plan, RD 49/2023).
What we do
The paperwork
Always the responsible declaration to the Direcció General de Recursos Hídrics, with the unit already installed (art. 70.4). For a new build on urban land with no mains sewer, a prior notice goes first to the Balearic water authority, Recursos Hídrics, which Santanyí town hall asks for before granting the licence (fourth transitional provision of the Balearic Urban Planning Act, Law 12/2017). If the water goes to a trench or soakaway well, or one of the cases above applies, prior authorisation.
As the installation company we prepare and sign the declaration that the installation meets the rules, the manufacturer's data sheets and performance, the maintenance plan and the electrical installation certificate. We hand it all over, and your architect or engineer files it.
Sources: Balearic Islands Water Plan, RD 49/2023 (art. 70, 76 and 77) · wetland catalogue, supply boreholes and aquifer vulnerability in the Balearic government IDEIB viewer · nitrate vulnerable zones (Decree 18/2023) · Mondragó Natural Park (CAIB).
How we work
Send us the location, the maximum beds, where the water will go and photos of the drain outlet and of the access from the street.
We check the distance to s'Amarador, the Font de n'Alis, the Prat de Porto Petro and the Estany de ses Gambes, and the zones around the wells that supply the municipality. Then a written quote.
We install with the pit as we gave it in writing, commission the plant and hand you all the signed documents.
Keep learning
The full guide: septic tank or treatment plant, paperwork, treated water and maintenance.
See the guide →Self-consumption for the house; by day, the blower runs on your sun too.
See solar in Santanyí →Heating and hot water with a heat pump, with its figures and grants.
See heat pumps in Santanyí →Across the east and south
Sewage treatment plants in the east and south: Manacor · Porto Cristo · Felanitx · Cala d'Or · Campos, or see the guide to sewage treatment plants in Mallorca →
Also in Santanyí: air conditioning · water softeners · EV charger installation
See our work and customer reviews on the JSL Google Maps profile →
Common questions
A treatment plant is exactly what the rules require for a house with no mains sewer (art. 70.1 of the Balearic Islands Water Plan, RD 49/2023). What changes is the paperwork: with 12 population equivalents or more, within 500 m of s'Amarador or s'Estany de sa Font de n'Alis, prior authorisation from the DGRH is needed. If the plot is inside the natural park, your engineer also checks what its management plan says (Decree 10/2022).
The responsible declaration to Recursos Hídrics, with four documents: proof of purchase and installation, technical specifications, the manufacturer's performance to EN 12566-3 and a maintenance plan (art. 70.4). We prepare and sign them; your engineer files them. Up to 12 population equivalents there is no annual report, but the declaration is filed all the same.
In Santanyí, by a tanker from an authorised waste management company that you hire, as often as the manufacturer specifies (art. 70.7.f). That is why, when siting the tank, we keep the access cover reachable from the street or lane. On a GRAF one2clean, the SV30 settling test at the service visit decides when: above 900 ml/l.
The designation of Santanyí's aquifer in Decree 18/2023 targets farming, not treatment plants. But it tells you the water below is already loaded with nitrogen, which is a good reason to reuse the treated water for irrigation on your plot (25 m² of garden per population equivalent, art. 70.12) rather than let it soak away. If the house is near a supply well, what counts is that well's protection zone.
In Santanyí and all over Mallorca, a new extended-aeration plant, approved and CE-marked, from the EN 12566 family (art. 70.14), with certified removal of at least BOD₅ 70 %, COD 75 % and suspended solids 70 % (art. 70.10). We work with every brand; as an example, the GRAF one2clean. The model is chosen by the maximum number of beds and how the house is used.
For what we install in Santanyí, yes: the service visits the regulations require or, if the manufacturer asks for more, the manufacturer's (two a year on the GRAF one2clean), with a signed report. We check the blower and air filter, aeration, settling, biology, control panel and alarm, and the outlet water. Between visits, you check the running light is green.
Quality
As an example, GRAF tanks. We propose the unit according to the beds and the use of each house.

Send us the location, the maximum number of beds, where the water will go and some photos. We reply within 24-48 hours on working days.