Sewage treatment plants in Mallorca
The full guide: septic tank or treatment plant, paperwork, treated water and maintenance.
See the guide →Sewage treatment · Portocolom
Portocolom has a sewer network and a public treatment works, but not everywhere: the sa Punta estate, by the lighthouse, was built in the 1960s without sewers and is still waiting for the works. If your house is there, or in the countryside around, the wastewater is treated on the plot. We are Joaquín and Juan, installers in Mallorca since 1998: we supply the new treatment plant, fit it, leave it running and prepare and sign the documents your architect or engineer asks for.
Send us photos and details · Reply within 24-48 hours on working days · We assist you in English, Spanish and German
Image: GRAF
Your area
What follows is not our opinion: it comes from the sewerage project for the estate, from the Felanitx town hall budget and from the Balearic government maps.
The design report of the sa Punta sewerage project (stamped in November 2009 and published by Spain's Ministry for the Ecological Transition) explains that its partial plans were approved in 1964 and 1966 and that the estate, 25.40 hectares of urban land, was never given sewers. It adds that most of its septic tanks are in fact plain cesspits that take advantage of the karst ground, with s'Arenal beach next door. A cesspit is none of the three solutions the Water Plan allows (art. 70.1): treatment plant, sealed holding tank, or natural treatment with a favourable report.
In December 2025 Felanitx town hall presented a budget with 1.6 million euros for the sa Punta sewer, and in April 2026 the environmental impact statement for the project was published (file 31A/2025): it provides for about 3,750 metres of sewer pipe and a pumping station towards the harbour network. When it will reach your street is for the town hall to say; until then, each house treats its wastewater on its own plot.
The Balearic government lists a borehole in sa Punta that supplies the Felanitx mains (IDEIB viewer, Water Plan supply-boreholes layer), with its protection zones, and the aquifer vulnerability map shows high vulnerability over most of the headland. There the rules only allow treated water to go to a green area, with denitrification and disinfection (art. 70.10, table 13). Across the harbour, the torrent des Caló d'en Marçal is a catalogued wetland (MAZH17). That is why the first step is to look at where the water goes and what lies around the house.
What we do
The paperwork
Portocolom, sa Punta and Cala Marçal belong to the municipality of Felanitx. To replace a cesspit or an old septic tank with a treatment plant, the paper is the responsible declaration to the Direcció General de Recursos Hídrics (DGRH), once the unit is installed (art. 70.4). If the house is still being built, the prior notice goes to Recursos Hídrics first (Felanitx town hall asks for it), and from then there are two years at most (art. 70.5).
On urban land with no sewer, the Balearic Planning Act 12/2017 (fourth transitional provision) also requires an approved collection system and a guarantee to connect once the sewer is in service; whether licences are being granted in your street today is for the town hall to confirm. We prepare and sign the technical documents as the installation company, and your architect or engineer files them.
Sources: Balearic Islands Water Plan, RD 49/2023 (art. 70) · wetland catalogue, supply boreholes and aquifer vulnerability in the Balearic government IDEIB viewer · design report of the sa Punta sewer project (2009) · GOB Mallorca, 28 June 2024 · Balearic Planning Act 12/2017, fourth transitional provision · Felanitx town hall 2026 budget and the environmental impact statement for the project (file 31A/2025).
How we work
Location, maximum beds, how the house is used, where the water will go, what is nearby, photos and your email.
We check wetlands, wells and aquifer vulnerability, and send you a written quote.
We fit the plant once the pit matches what we gave you in writing, commission it and hand over the signed documents.
Keep learning
The full guide: septic tank or treatment plant, paperwork, treated water and maintenance.
See the guide →Self-consumption for the house; by day, the blower runs on your sun too.
See solar in Portocolom →Heating and hot water with a heat pump, with its figures and grants.
See heat pumps in Portocolom →Other areas off the mains
Sewage treatment plants in other areas with homes off the mains: Cala Murada · Cala Ratjada · Sóller, or see the guide to sewage treatment plants in Mallorca →
Sewage treatment plants near Portocolom: Porto Cristo · Cala d'Or · Felanitx
Also in Portocolom: air conditioning
See our work and customer reviews on the JSL Google Maps profile →
Common questions
As of the environmental impact statement for the project (April 2026, file 31A/2025), no: the project is precisely to give sa Punta a network of about 3,750 metres, pumped towards the harbour network, and Felanitx town hall set aside 1.6 million euros in its 2026 budget. Until the works reach your street, the wastewater from the house is treated on the plot.
The Balearic Islands Water Plan (RD 49/2023, art. 70.1) allows only three solutions for a house with no mains sewer: a treatment plant, a sealed holding tank, or natural treatment with a favourable report. A cesspit is none of them. We replace it with a new extended-aeration plant, approved to EN 12566 and CE-marked; we work with every brand and, as an example, the GRAF one2clean.
Soaking away through a trench or a well always needs prior authorisation from the DGRH, and where the government map shows high aquifer vulnerability (most of sa Punta) the rules only allow discharge to a green area, with denitrification and disinfection (art. 70.10, table 13). The answer is to water the garden: 25 m² of green area per population equivalent (art. 70.12), 100 m² for a 4-bed house.
It depends on the timing and on what you have now. If the house discharges into a cesspit, it is already outside what the Water Plan allows (art. 70.1), sewer or no sewer. Ask Felanitx town hall about the works in your street; with that and the location we look with you at which of the permitted solutions fits, knowing that on the day the sewer is in service the house is connected.
Your builder or digger contractor: the pit, the sand bed and backfill, the trenches and the inspection chambers. The sewerage project itself describes the ground in sa Punta as mostly rock, so before anyone asks for a digging price we give you the pit measurements in writing from the manufacturer, and we fit the plant once the pit matches them: a badly bedded tank loses the manufacturer's warranty.
Yes: Portocolom, sa Punta, Cala Marçal, s'Horta and the country houses around. Service visits on what we install are the ones the regulations require or, if the manufacturer asks for more, the manufacturer's (two a year on the GRAF one2clean). We reply within 24-48 hours on working days, in English, Spanish or German, and we don't subcontract anyone.
Quality
As an example, GRAF tanks. We propose the unit according to the beds and the use of each house.

Send us the location, the maximum number of beds, what is there now (septic tank or cesspit), where the water will go and a few photos. We reply within 24-48 hours on working days.