Sewage treatment plants in Mallorca
The full guide: septic tank or treatment plant, paperwork, treated water and maintenance.
See the guide →Sewage treatment · Sóller
Sóller, the Port and Biniaraix have a sewer network and a public treatment works, but the valley is full of houses among orange groves and olive terraces that lie outside it: the town hall's own Local Agenda 21 notes that many homes on rural land are not connected. If yours is one of them, the wastewater is treated on the finca. We are Joaquín and Juan, installers in Mallorca since 1998: we supply the new treatment plant, fit it, leave it running and prepare and sign the documents your architect or engineer asks for.
Send us photos and details · Reply within 24-48 hours on working days · We assist you in English, Spanish and German
Image: GRAF
Your area
The rules are the Balearic Islands Water Plan (Royal Decree 49/2023, art. 70), as everywhere on the island. Three things are different in Sóller.
The environmental assessment in Sóller's Local Agenda 21, by the town hall (with figures from 2004 to 2007), places the sewer network in three settlements (Sóller, the Port and Biniaraix, a little over 16 kilometres in all) and lists, among the points to improve, that many homes on rural land are not connected. That is the case for many of the orchard and mountain houses in the valley: there the wastewater is treated on the plot, with an approved unit.
The same assessment counts one registered well for every 35 inhabitants, more than a third of them for domestic use. In addition, the Balearic government lists about ten public-supply boreholes in the valley (IDEIB viewer, Water Plan supply-boreholes layer), with their protection zones: inside the strictest one, the plant includes denitrification and disinfection (art. 70.10, table 13). With so many wells nearby, we first look at where the water goes and what lies around the house.
The mountains around the valley are part of the Serra de Tramuntana Natural Area, declared in 2007; its natural resources management plan was approved by Decree 19/2007. If the finca lies within it, your architect or engineer also checks what that plan says. And on the government aquifer vulnerability map, there are areas of high vulnerability around the Port and in parts of the valley, where the rules only allow discharge to a green area, with denitrification and disinfection (art. 70.10, table 13).
What we do
The paperwork
With the water reused in the orchard or the garden, the responsible declaration to the Direcció General de Recursos Hídrics (DGRH), once the unit is installed (art. 70.4). If the house is still being built, the prior notice goes to Recursos Hídrics first (Sóller town hall asks for it), and from then there are two years at most to file the declaration (art. 70.5). If the water goes to a drainage trench or soakaway well, prior authorisation.
As the installation company we prepare and sign the documents for the unit (technical data, the manufacturer's performance figures, maintenance plan, proof of purchase and installation, and the electrical installation certificate), and your architect or engineer files them.
Sources: Balearic Islands Water Plan, RD 49/2023 (art. 70) · wetland catalogue, supply boreholes and aquifer vulnerability in the Balearic government IDEIB viewer · Sóller Local Agenda 21, environmental assessment (Sóller town hall) · Serra de Tramuntana Natural Area (CAIB).
How we work
Location, maximum beds, how the house is used, where the water will go, what is nearby, photos and your email.
We check wetlands, wells and aquifer vulnerability, and send you a written quote.
We fit the plant once the pit matches what we gave you in writing, commission it and hand over the signed documents.
Keep learning
The full guide: septic tank or treatment plant, paperwork, treated water and maintenance.
See the guide →Self-consumption for the house; by day, the blower runs on your sun too.
See solar in Sóller →Heating and hot water with a heat pump, with its figures and grants.
See heat pumps in Sóller →Other areas off the mains
Sewage treatment plants in other areas with homes off the mains: Cala Murada · Portocolom · Cala Ratjada, or see the guide to sewage treatment plants in Mallorca →
Sewage treatment plants near Sóller: Palma · Bunyola
Also in Sóller: air conditioning
See our work and customer reviews on the JSL Google Maps profile →
Common questions
No. The municipal network covers the settlements of Sóller, the Port and Biniaraix, and the town hall's Local Agenda 21 notes that many homes on rural land are not connected. For those houses, the Balearic Islands Water Plan (RD 49/2023, art. 70.1) allows three solutions: a treatment plant, a sealed holding tank, or natural treatment with a favourable report.
Reusing it on your own finca is the first option in the rules, with at least 25 m² of green area per population equivalent (art. 70.12): 150 m² for a 6-bed house. What needs checking in Sóller is which wells are nearby: the valley has many, and around the public-supply ones there are protection zones that change the unit (art. 70.10, table 13). With the Google Maps pin we check it before quoting.
Yes, if the spot is chosen well: the tank needs a pit bedded as the manufacturer specifies, and the access cover has to be reachable by the tanker of the authorised waste management company that empties the sludge (art. 70.7.f of the Water Plan). That is why in Sóller we ask for photos of the drain outlet, the spot for the tank and the access before proposing a unit. Your builder digs the pit, to the measurements we give in writing.
A treatment plant is exactly what the rules require for a house with no mains sewer (art. 70.1 of the Balearic Islands Water Plan, RD 49/2023). If the plot lies inside the natural area, your architect or engineer also checks what its management plan says (Decree 19/2007). We supply the approved unit, CE-marked and from the EN 12566 family, and prepare and sign its documents.
Yes. An extended-aeration plant moves air with a blower that runs 24 hours a day. We run the cable from the house consumer unit to a weatherproof outdoor sub-board next to the blower cabinet, as an authorised low-voltage installation company. If the house is closed for months, the blower keeps running so the bacteria do not die.
Service visits on what we install are the ones the regulations require or, if the manufacturer asks for more, the manufacturer's: on the GRAF one2clean, for example, two a year, with a signed report. We cover Sóller, the Port, l'Horta, Biniaraix and the fincas in the valley; we reply within 24-48 hours on working days, in English, Spanish or German, and we don't subcontract anyone.
Quality
As an example, GRAF tanks. We propose the unit according to the beds and the use of each house.

Send us the Google Maps location, the maximum number of beds, where the water will go and photos of the drain outlet, the spot and the access. We reply within 24-48 hours on working days.