Sewage treatment plants in Mallorca
Septic tank, treatment plant or holding tank, the documents and maintenance, in detail.
See the guide →Treatment plants · Alaró
The village of Alaró treats its waste water at its own treatment works; the mountain fincas and the country houses, on rural land, have no mains sewer, and according to the 2025 INE gazetteer 951 of the 6,172 residents live scattered outside the village. Underneath lies the Penyaflor aquifer, which supplies Alaró, the neighbouring villages and, in part, Palma. We are Joaquín and Juan, installers in Mallorca since 1998: we supply the new treatment plant, install it, do the electrics and prepare and sign the documents for your architect or engineer to file.
Send us photos and details · Reply within 24-48 hours on working days · We assist you in English, Spanish and German
Your area
The data sheet for the Penyaflor groundwater body (1809M2), in Annex 9 of the Balearic Water Plan, describes what lies under Alaró. It is worth knowing before choosing a unit.
Penyaflor is an aquifer of 45 km², on the southern slope of the Serra de Tramuntana, made up of Jurassic limestone and dolomite and Oligocene conglomerates. In practice, on many plots the pit for the treatment plant is dug in rock: your builder should know that before excavating. We give them in writing how it has to be left according to the manufacturer.
According to the Plan, Penyaflor contributes to Palma's supply as well as that of Alaró, Binissalem, Consell and Lloseta, and more is taken out than is replenished: the abstraction index is 103%. Where there are supply wells there are protection perimeters, and inside the maximum-restriction one the treatment plant includes disinfection and denitrification (art. 70.10, table 13).
A mountain finca usually has little soil and a lot of slope. The rule is to reuse the treated water on the plot, with 25 m² of green area per population equivalent (art. 70.12); if that isn't available, what remains is the sealed holding tank or, with a favourable report and prior authorisation, the drainage trench.
Sources: Balearic Water Plan, Royal Decree 49/2023 (regulations, art. 70 and 71) · Annex 9 of the Plan, data sheet for the groundwater body “Penyaflor (1809M2)” · EN 12566 · manufacturer's manual (GRAF one2clean, as an example).
The rules here
The treatment plant of a house with no mains sewer is declared to the Balearic water authority (the Balearic Government's Direcció General de Recursos Hídrics) with a responsible declaration: proof of purchase and installation, technical specifications, performance and maintenance plan (art. 70.4). If the house is under construction, the prior notification goes first and then there are at most two years for the declaration (art. 70.5).
With 12 population equivalents or more, if the plot is inside the restriction perimeter of a supply well or 500 m or less from a wetland, a prior authorisation is needed. As the installation company we prepare and sign the documents your architect or engineer asks for; your architect or engineer files them.
What we do
How we work
Send us where the estate is, the bed spaces, which wells are nearby and photos. We check on the DGRH map viewer whether it falls inside a Penyaflor protection perimeter.
We give you in writing the unit, installation, electrics and documents, and your builder the dimensions of the pit and the backfill according to the manufacturer.
Once the pit is open we install, commission and hand over the signed documents. If the house is under construction, after the prior notification there are two years at most to declare it (art. 70.5).
Keep learning
The general guide to treatment plants and what else we do in your area.
Septic tank, treatment plant or holding tank, the documents and maintenance, in detail.
See the guide →Self-consumption for the house, the treatment plant blower included.
See solar in Alaró →Heating and hot water with a heat pump.
See heat pumps in Alaró →Across Mallorca
Sewage treatment plants in the Raiguer and the Tramuntana: Consell · Sencelles · Selva · Bunyola · Esporles, or see the guide to sewage treatment plants in Mallorca →
And for the summer: air conditioning in Alaró →
Need the house drainage (downpipes, rainwater, chambers)? Drainage in Mallorca →
Sewage treatment plants near Alaró: Binissalem · Lloseta · Santa Maria del Camí
See our work and customer reviews on the JSL Google Maps profile →
Common questions
Because Alaró, Binissalem, Consell, Lloseta and, in part, Palma are supplied from it, and the Balearic Water Plan (Royal Decree 49/2023, Annex 9) rates it in poor quantitative status, with abstraction at 103%. Where there are supply wells there are protection perimeters; inside the maximum-restriction one the unit includes disinfection and denitrification (art. 70.10). We check it on the DGRH map viewer with your location.
Yes. The Penyaflor aquifer is limestone and dolomite, according to Annex 9 of the Water Plan, and it is normal for the pit to be dug in rock. The excavation is done by your builder; beforehand we give them in writing the dimensions of the pit and how it is backfilled, according to the manufacturer's manual. We install the unit, approved in accordance with EN 12566, and the electrics.
The rule is to reuse it on the plot, with 25 m² of green area per population equivalent (art. 70.12 of the Balearic Water Plan, Royal Decree 49/2023). If that ground isn't available, there is the sealed holding tank emptied periodically (art. 70.2.a) or the drainage trench, which needs a favourable report and prior authorisation, whatever the number of bed spaces.
The responsible declaration for the treatment plant is filed with the Direcció General de Recursos Hídrics of the Balearic Government (art. 70.4 of the Balearic Water Plan, Royal Decree 49/2023), not at the town hall. As the installation company we prepare and sign the documents; your architect or engineer files them, together with whatever the building licence requires.
The servicing the regulations set or, if the manufacturer asks for more, the manufacturer's: on the GRAF one2clean, as an example, two a year according to its manual, with a signed report. The sludge is emptied by an authorised waste management company (art. 70.7.f). If the house is used seasonally, the important thing is not to cut the power to the treatment plant. And if you drink from a well or a cistern, like a good share of the houses outside the village according to Alaró's energy and climate plan, all the more reason to keep it up to date.
Below 12 population equivalents (in a home, one per bed space) and reusing the water on the plot, the responsible declaration is enough (art. 70.4 of the Balearic Water Plan, Royal Decree 49/2023). A prior authorisation is needed if the water goes to a trench or a soakaway, whatever the number of bed spaces.
Quality
As an example, GRAF tanks. We propose the unit for each house and what the area requires.

Send us the location, the number of bed spaces, which wells are nearby and a few photos. We reply within 24-48 hours on working days.