Sewage treatment plants in Mallorca
Septic tank, treatment plant or holding tank, the documents and maintenance, in detail.
See the guide →Treatment plants · Esporles
The village of Esporles sends its waste water through a main sewer to Palma's treatment works, and the torrent has felt the difference. The fincas in the valley that this sewer does not reach have to treat their water themselves. We are Joaquín and Juan, installers in Mallorca since 1998: we supply the new treatment plant, install it, do the electrics and prepare and sign the documents for your engineer to file.
Send us photos and details · Reply within 24-48 hours on working days · We assist you in English, Spanish and German
Your area
The Esporles torrent has its own data sheet in Annex 9 of the Balearic Water Plan (water body 11013007). It is a good summary of why what each house in the valley does matters, and here 1,148 of the 5,321 residents live in scattered dwellings outside the village, according to the 2025 INE gazetteer.
The catchment covers 38 km² and runs largely through rural land. According to the Plan, Esporles's waste water is carried by a main sewer to Palma's treatment works, so there is no longer any discharge into the torrent, and it puts the clear improvement in the water down to that: the chemical status is now very good. The biological status does not yet reach good status.
The Plan points out that some of the springs in the catchment are used for water supply and for irrigation, and EMAYA abstracts the Font d'en Baster for Palma, on the possessió (estate) of Son Quint, within the municipality of Esporles. A badly sited treatment plant upstream of a spring is a problem for whoever drinks from it: that is why we ask which springs, wells and watercourses are near your house.
With the village dealt with, the Plan relies on the general measures to reduce the pollutant load on rural land. In other words, on every finca off the mains having a system that really treats the water, instead of a cesspit.
Sources: Balearic Water Plan, Royal Decree 49/2023 (regulations, art. 70 and 71) · Annex 9 of the Plan, data sheet for the surface water body “Esporles (11013007)” and general measures for rural land · EN 12566 · manufacturer's manual (GRAF one2clean, as an example).
The rules here
The system has to be installed without polluting the water, taking the ground and its position into account (art. 70.7.a and c), and it must not collect rainwater (art. 70.7.d). The treated water is reused on the plot, with 25 m² of green area per population equivalent (art. 70.12); it is not sent to the torrent.
The unit, approved with CE marking and compliant with EN 12566 (art. 70.14), is declared to the Balearic water authority (Direcció General de Recursos Hídrics) (art. 70.4). As the installation company we prepare and sign the documents your engineer asks for; your architect or your engineer files them.
What we do
How we work
Location, bed spaces, which torrent, spring or well is nearby and photos. If you are in ses Rotgetes de Canet, first ask the Town Hall how the sewer on your street is coming along.
Unit, installation, electrics and documents, with the place for the unit and the irrigation area away from springs and watercourses. The pit, in writing for your builder.
We install, commission and give your engineer the signed documents. The treated water stays on your plot: 25 m² of green area per population equivalent.
Keep learning
The general guide to treatment plants and what else we do in your area.
Septic tank, treatment plant or holding tank, the documents and maintenance, in detail.
See the guide →Self-consumption for the house, the treatment plant blower included.
See solar in Esporles →Heating and hot water with a heat pump.
See heat pumps in Esporles →Across Mallorca
Sewage treatment plants in the Raiguer and the Tramuntana: Alaró · Consell · Sencelles · Selva · Bunyola, or see the guide to sewage treatment plants in Mallorca →
And for the summer: air conditioning in Esporles →
Need the house drainage (downpipes, rainwater, chambers)? Drainage in Mallorca →
Sewage treatment plants near Esporles: Palma
See our work and customer reviews on the JSL Google Maps profile →
Common questions
The village's goes to Palma: according to Annex 9 of the Balearic Water Plan (Royal Decree 49/2023), it is carried by a main sewer to Palma's treatment works and there is no discharge into the torrent; EMAYA confirms that its EDAR 2 plant receives water from Esporles. The Plan also provides for upgrading that pipeline, with about €290,000. Fincas and houses with no access to the main sewer need their own system (art. 70.1).
That is not what the rules provide for. The Balearic Water Plan (Royal Decree 49/2023, art. 70.12) requires the treated water to be reused on the plot itself, with 25 m² of green area per population equivalent. If there is no land, what is left is a sealed holding tank emptied periodically or a drainage trench, with a favourable report and prior authorisation. The Esporles torrent is a water body the Plan wants to bring to good status.
It affects where it goes. The Water Plan requires the system to be installed without polluting the water and taking the ground and its position into account (art. 70.7.a and c of Royal Decree 49/2023), and in Esporles there are springs used for water supply, such as the Font d'en Baster, which EMAYA abstracts for Palma. We look at the location in the DGRH map viewer and choose the site for the unit and for the irrigation away from the spring.
It depends on whether your house can be connected to a network. In February 2023, Esporles town hall and the Consell de Mallorca signed an agreement to draw up the project for the first phase of the estate's sewer network. As long as a home has no access to the mains sewer, the Balearic Water Plan (Royal Decree 49/2023, art. 70.1) requires it to have its own system. Ask at the town hall how things stand in your street; we'll tell you which unit fits.
Yes, always. The responsible declaration to the Direcció General de Recursos Hídrics is filed below 12 population equivalents too (art. 70.4 of the Balearic Water Plan). Above 12 (not with exactly 12), in addition, the performance check and the sludge register are sent in every year (art. 70.11).
A new treatment plant, approved, with CE marking and compliant with EN 12566 (art. 70.14 of the Water Plan). We work with every brand; as an example, the GRAF one2clean, whose manual asks for two services a year: we carry out those set by the regulations or, if the manufacturer asks for more, the manufacturer's. The sludge is emptied by an authorised waste management company (art. 70.7.f). In the Esporles valley, with its rain, we check that rainwater does not get into the unit.
Quality
As an example, GRAF tanks. We propose the unit for each house and what the area requires.

Send us the location, the number of bed spaces, which torrent, spring or well is nearby and a few photos. We reply within 24-48 hours on working days.