Sewage treatment plants in Mallorca
Septic tank, treatment plant or holding tank, the documents and maintenance, in detail.
See the guide →Treatment plants · Santa Maria del Camí
Between the village and the Serra, Santa Maria del Camí is a land of estates, country houses and agritourism, many on rural land and off the mains. The Water Plan lists as done the refurbishment of the village treatment works and an irrigation scheme with reclaimed water; on your estate, the rules ask for the same on a small scale: treat and irrigate on your plot. We are Joaquín and Juan, installers in Mallorca since 1998.
Send us photos and details · Reply within 24-48 hours on working days · We assist you in English, Spanish and German
Your area
The municipality of Santa Maria del Camí touches two groundwater bodies of the Water Plan, Inca (1811M3) and Pont d'Inca (1814M3), and both are in poor chemical status because of nitrates.
The Inca body, made of Tertiary and Quaternary alluvial and colluvial material, has 66 mg/l of nitrates and receives the treated water from the area's treatment works, Santa Maria's among them (0.25 hm³ a year). The Plan asks to continue the vulnerable-zone programmes and to improve waste-water treatment.
Part of the municipality lies over Pont d'Inca, which supplies Palma and Marratxí. Where there are public supply wells there are protection perimeters, and inside the maximum restriction one the treatment plant needs disinfection and denitrification (art. 70.10, table 13).
The rule in art. 70.12 is to reuse treated water on your plot, with 25 m² of green area per population equivalent. What needs checking on an estate is where that green area sits relative to wells and the house, because the site of the system must take the ground and its position into account (art. 70.7.c).
Sources: Balearic Water Plan, Royal Decree 49/2023 (regulations, art. 70, 71, 76 and 77) · Annex 9 of the Plan, entries for the groundwater bodies “Inca (1811M3)” and “Pont d'Inca (1814M3)” · EN 12566 · manufacturer's manual (GRAF one2clean, as an example).
The rules here
Table 12 of the Water Plan gives the equivalences: in rural houses and agritourism, one population equivalent per bed space; staff living on site, one each; staff who do not live there, a quarter; and in restaurants and event venues, a quarter per seat.
In hospitality, agritourism included, a grease separator before the treatment plant is compulsory (art. 70.7.e). And above 12 population equivalents, the performance checks and the sludge log go to the DGRH every year (art. 70.11).
What we do
How we work
Tell us how many bed spaces the estate has, who lives there, whether there are meals or events and which wells lie around: yours, the neighbours' or public supply.
We add up the population equivalents from table 12 and give you the unit, the grease separator if needed, the electrics and where to irrigate with the treated water.
Once your builder has dug the pit we install and start the plant; your engineer gets the signed documents to file the responsible declaration with the DGRH.
Keep learning
The general guide to treatment plants and what else we do in your area.
Septic tank, treatment plant or holding tank, the documents and maintenance, in detail.
See the guide →Self-consumption for the house, the treatment plant blower included.
See solar in Santa Maria del Camí →Heating and hot water with a heat pump.
See heat pumps in Santa Maria del Camí →Across Mallorca
Sewage treatment plants by area (west and centre): Palma · Andratx · Calvià · Llucmajor · Marratxí · Binissalem, or see the guide to sewage treatment plants in Mallorca →
Need the house drainage (downpipes, rainwater, chambers)? Drainage in Mallorca →
Sewage treatment plants near Santa Maria del Camí: Lloseta · Santa Eugènia · Alaró · Consell · Sencelles · Bunyola
Also in Santa Maria del Camí: air conditioning
See our work and customer reviews on the JSL Google Maps profile →
Common questions
According to table 12 of the Balearic Water Plan (Royal Decree 49/2023): 16 population equivalents for the bed spaces, plus one for each member of staff living on the estate and a quarter for each one who does not. Above 12, the pre-treatment includes grease removal, the grease separator is compulsory in hospitality (art. 70.7.e) and a report goes to the DGRH every year (art. 70.11).
Yes, in where it goes. The Water Plan requires the system to be sited without polluting groundwater and taking into account the ground and its position (art. 70.7.a and c of the Balearic Water Plan, Royal Decree 49/2023). That is why we ask which wells are nearby —yours, neighbours' or public supply— and how far; if it is a public supply well, we check the DGRH map.
As a routine, no: continuous aeration, 24 hours a day, keeps the biology going. Only at start-up, after a complete emptying or if the biology has suffered from antibiotics, a lot of bleach or the blower being stopped. In a Santa Maria agritourism that closes in winter, the key is not to switch off the treatment plant's power.
Yes. Art. 70.4 of the Water Plan requires a responsible declaration to the water authority for both an on-site treatment system and a sealed holding tank, with proof of purchase and installation, technical specifications and a maintenance plan. And the tank is emptied completely by an authorised company (art. 70.7.f of the Balearic Water Plan, Royal Decree 49/2023).
It is the unit used to size the treatment plant and to apply the thresholds in the rules. The Balearic Water Plan (Royal Decree 49/2023) gives guideline equivalences (table 12): in a home and in agritourism, one per bed space; in hotels, 1.1; in restaurants, a quarter per seat. That tells you whether you are above 12, which is where the requirements change.
Yes, because it adds load. Table 12 of the Water Plan counts a quarter of a population equivalent per seat in restaurants and event venues, and a third in leisure spaces used for more than four hours. And in hospitality a pre-treatment for oils and grease is compulsory (art. 70.7.e of the Balearic Water Plan, Royal Decree 49/2023).
Quality
As an example, GRAF tanks. We propose the unit for each house and what the area requires.

Send us the location, the bed spaces, whether there are staff or meals and a few photos. We reply within 24-48 hours on working days.