Sewage treatment plants in Mallorca
Septic tank, treatment plant or holding tank, the documents and maintenance, in detail.
See the guide →Treatment plants · Santa Eugènia
Part of Santa Eugènia lies above the aquifer that supplies Palma and Marratxí, and that affects what is required of each house with no mains sewer. We are Joaquín and Juan, installers in Mallorca since 1998: we supply the new treatment plant, install it, do the electrics and prepare and sign the documents for your engineer to submit.
Send us photos and details · Reply within 24-48 hours on working days · We assist you in English, Spanish and German
GRAF one2clean · Image: GRAF
Your village
The Water Plan places the municipality of Santa Eugènia over two groundwater bodies: Pont d'Inca (1814M3), which it shares with Palma, Marratxí and Santa Maria del Camí, and Inca (1811M3), which lies under the Raiguer.
According to Annex 9 of the Plan, part of the water from Pont d'Inca is used to supply Palma and Marratxí. The body is in poor status: 82 mg/l of nitrates, 325 mg/l of chlorides and an abstraction index of 87 %. Where there are public supply wells there are protection perimeters, and inside the maximum restriction perimeter the treatment plant needs disinfection and denitrification (art. 70.10, table 13).
The Inca body, made of alluvial materials, has 66 mg/l of nitrates and has been under vulnerable-zone programmes since 2010. Among others, it receives the treated water from the Santa Eugènia treatment works. The Plan calls for wastewater treatment to keep improving.
The Plan's measures include, as already carried out, the sewerage of ses Coves. It serves as an example of what art. 70.9 says: while there is no network, each house needs its own system; once the network is working, there is at most one year to make the connection.
The rules here
Before quoting for a treatment plant it is worth asking the town council whether your house can connect to the network. If it can, the solution is the connection, not a treatment plant. If it can't, art. 70.9 of the Water Plan does not let you wait with a cesspit: until the connection is made, one of the systems in art. 70.1 is needed.
For houses that remain off the mains, the responsible declaration is submitted to the Direcció General de Recursos Hídrics (DGRH) (art. 70.4). We prepare and sign the documents as the installation company; your architect or engineer submits them.
What we do
Sources: Balearic Water Plan, Royal Decree 49/2023 (regulations, art. 70, 71, 76 and 77) · Annex 9 of the Plan, entries for the groundwater bodies “Pont d'Inca (1814M3)” and “Inca (1811M3)” and the measure “Saneamiento de Ses Coves” · EN 12566 · manufacturer's manual (GRAF one2clean, as an example).
How we work
First, ask the town council whether you can connect. If not, send us the location, the bed spaces and the wells nearby, and we check the protection zones on the DGRH map.
If the house lies inside the maximum-restriction zone of a well, the unit includes disinfection and denitrification. We send it in writing: unit, installation, electrics and documents.
With the pit your builder prepares to our instructions, we install and commission, and hand over the signed documents for the responsible declaration.
Common questions
It could. The Pont d'Inca aquifer, under part of the municipality, partly supplies Palma and Marratxí, according to Annex 9 of the Balearic Water Plan (Royal Decree 49/2023). The protection perimeters of the supply wells are shown on the DGRH map: we check it with the location before giving you a price, because inside the maximum restriction perimeter the unit includes disinfection and denitrification (art. 70.10, table 13).
Yes. Once the network is in operation, art. 70.9 of the Balearic Water Plan (Royal Decree 49/2023) gives at most one year to make the connection. The Plan lists the sewerage of ses Coves, in Santa Eugènia, as carried out. If your house can connect, what you need is the connection; we cover the house's internal drainage on our drainage page.
No. Art. 70.9 of the Balearic Water Plan (Royal Decree 49/2023) requires that, until the connection is made, the house has one of the three systems the rules accept: a treatment plant, a sealed holding tank emptied periodically or a natural system with a favourable report. A cesspit is not one of them. The Plan provides for the sealed holding tank when there is no space for the treated water or in houses used seasonally (art. 70.2).
Two things change. Above 12 population equivalents (in a home, one per bed space, art. 70.8), the performance checks and the maintenance and sludge log must be sent to the DGRH every year (art. 70.11 of the Balearic Water Plan, Royal Decree 49/2023). And with 12 or more, if the house is inside the restriction perimeter of a public supply well or 500 m or less from a wetland, a favourable report from the Water Authority is also needed (arts. 76.5 and 77.3).
No. Art. 70.7.d of the Balearic Water Plan (Royal Decree 49/2023) forbids the treatment plant from collecting rainwater. The downpipes go to their own network or to a cistern. In a house in Santa Eugènia with a cistern, the rainwater is stored; see our guide to well and cistern water.
Keep learning
The general guide to treatment plants and what else we do in Santa Eugènia.
Septic tank, treatment plant or holding tank, the documents and maintenance, in detail.
See the guide →What a roof in Santa Eugènia produces according to PVGIS, the permits and the grants.
Solar panels in Santa Eugènia →Heating, hot water and cooling from one heat pump, and the FACTOR 2026 grant.
Heat pumps in Santa Eugènia →In the Pla and across Mallorca
Sewage treatment plants in the Pla de Mallorca: Montuïri · Vilafranca de Bonany · Sant Joan · Maria de la Salut · Costitx. Also nearby: Santa Maria del Camí · Marratxí · Sencelles · Palma, or see the guide to sewage treatment plants in Mallorca →
Need the house drainage (downpipes, rainwater, chambers)? Drainage in Mallorca →
Also in Santa Eugènia: air conditioning
See our work and customer reviews on the JSL Google Maps profile →
Quality
As an example, GRAF tanks. We propose the unit for each house and what the area requires.

Send us the location, the bed spaces, whether there are wells nearby and a few photos. We reply within 24-48 hours on working days.