Sewage treatment plants in Mallorca
Septic tank, treatment plant or holding tank, the documents and maintenance, in detail.
See the guide →Treatment plants · Montuïri
The village of Montuïri has its sewer network and its treatment works, shared with Algaida. The fincas on the plain do not: there each house treats its own water, and the Balearic Water Plan sets out how. We are Joaquín and Juan, installers in Mallorca since 1998: we supply the new treatment plant, install it, do the electrics and prepare and sign the documents for your engineer to submit.
Send us photos and details · Reply within 24-48 hours on working days · We assist you in English, Spanish and German
GRAF · Image: GRAF
Your village
The Balearic Water Plan devotes an entry to the Montuïri groundwater body (1815M2): 83 km² shared by Montuïri, Algaida, Porreres and Sant Joan. What it says explains why treated water is worth making use of here.
According to Annex 9 of the Plan, the Montuïri body is in poor status because of chlorides, with 330 mg/l on average, and has 220 mg/l of sulphates. It is not pollution: the Plan puts it down to natural causes, to the Miocene marls it rests on, and so does not expect it ever to reach good status.
With well water like that, the household water, properly treated, is a resource for the garden. The Plan's general rule is exactly that: reuse it on your plot, with 25 m² of green area per population equivalent (art. 70.12).
The Plan describes the body as a set of small aquifers of Jurassic carbonate and Tertiary detrital materials. For the works: from one plot to the next you may hit rock or soil. The excavation is done by your builder, and beforehand we give them in writing how the pit must be prepared according to the manufacturer.
The rules here
A house with no access to the mains sewer needs an on-site treatment system, a sealed holding tank that is emptied periodically or a natural system with a favourable report (art. 70.1 of the Water Plan). The treatment plant is declared to the Direcció General de Recursos Hídrics (DGRH) with proof of purchase and installation, technical specifications, performance and the maintenance plan (art. 70.4).
We prepare and sign those documents as the installation company, and your architect or engineer submits them. If it is a new house on residential urban land without sewers, the prior notification to Recursos Hídrics goes first (Balearic Planning Act 12/2017, fourth transitional provision) and from then there are at most two years for the declaration (art. 70.5).
What we do
Sources: Balearic Water Plan, Royal Decree 49/2023 (regulations, art. 70, 71, 76 and 77) · Annex 9 of the Plan, entries for the groundwater body “Montuïri (1815M2)” · EN 12566 · manufacturer's manual (GRAF one2clean, as an example).
How we work
Send us the location, the bed spaces and whether the treated water will go to irrigation, a trench or a soakaway. In Montuïri the first thing is whether the house is in the village, with sewers, or out on the plain.
We send you in writing the unit, installation, electrics and documents, with the green area art. 70.12 asks for: 25 m² per population equivalent. And your builder gets how to prepare the pit.
Once the pit is dug, we install, connect the outlet to the irrigation and commission the plant. We hand over the signed documents so your engineer can file the declaration.
Common questions
Yes, in any house that cannot connect to the mains sewer. The Balearic Water Plan (Royal Decree 49/2023, art. 70.1) accepts three solutions: an on-site treatment system, a sealed holding tank that is emptied periodically or a natural system with a favourable report. The village of Montuïri has a sewer network and a treatment works; the fincas on rural land around it generally do not.
That is what the rules ask for: reusing the treated water on the plot itself, with 25 m² of green area per population equivalent (art. 70.12 of the Balearic Water Plan, Royal Decree 49/2023). In Montuïri it also makes practical sense: Annex 9 of the Plan gives the aquifer 330 mg/l of chlorides of natural origin, so the well water is brackish for many plants.
Because a cesspit neither treats the water nor is sealed, and it is not one of the three solutions in art. 70.1 of the Balearic Water Plan (Royal Decree 49/2023). What we install is a new, approved, CE-marked treatment plant compliant with EN 12566 (art. 70.14), with the minimum performance of art. 70.10: BOD₅ 70 %, COD 75 % and suspended solids 70 %.
It depends on the plot. The Balearic Water Plan (Royal Decree 49/2023) describes the subsoil of Montuïri as a set of small aquifers of Jurassic carbonate and Tertiary detrital materials, with marls. You may hit rock or soil. The excavation, the sand bed and the backfill are done by your builder; beforehand we give them in writing how the pit must be prepared according to the manufacturer.
Your architect or your engineer. As the installation company we prepare and sign what they ask for: the declaration that the installation complies with the rules, the manufacturer's data sheets and performance, the maintenance plan and the electrical installation certificate. With that, the responsible declaration is submitted to the Direcció General de Recursos Hídrics (DGRH) (art. 70.4 of the Balearic Water Plan, Royal Decree 49/2023).
Keep learning
The general guide to treatment plants and what else we do in Montuïri.
Septic tank, treatment plant or holding tank, the documents and maintenance, in detail.
See the guide →What a roof in Montuïri produces according to PVGIS, the permits and the grants.
Solar panels in Montuïri →Heating, hot water and cooling from one heat pump, and the FACTOR 2026 grant.
Heat pumps in Montuïri →In the Pla and across Mallorca
Sewage treatment plants in the Pla de Mallorca: Vilafranca de Bonany · Sant Joan · Santa Eugènia · Maria de la Salut · Costitx. Also nearby: Manacor · Llucmajor · Palma, or see the guide to sewage treatment plants in Mallorca →
Need the house drainage (downpipes, rainwater, chambers)? Drainage in Mallorca →
Also in Montuïri: air conditioning
See our work and customer reviews on the JSL Google Maps profile →
Quality
As an example, GRAF tanks. We propose the unit for each house and what the area requires.

Send us the location, the bed spaces of the house, where the water will go and a few photos. We reply within 24-48 hours on working days.