Solar panels in Mallorca
How self-consumption, batteries and payback work, in detail.
See the full guide →Solar panels · Can Picafort
Can Picafort lives from May to October: apartment blocks, hotels and summer houses about ten kilometres from Santa Margalida village. We install solar panels and self-consumption systems on flat roofs, villas in Son Bauló and businesses on the promenade, with those months in mind. We are an authorised low-voltage electrical installer: design, installation, legalisation and paperwork, with no middlemen.
Send us photos and details · Reply within 24-48 hours on working days · We assist you in English, Spanish and German
Image: LONGi
Your area
Hardly anyone here has a south-facing tiled roof: what you find are the flat roofs of three- or four-storey buildings, a few metres from the sea. That changes how the panels are fitted, who decides to fit them and which materials last.
The roof belongs to all the owners, but a unanimous vote isn't needed: Spain's Horizontal Property Act (art. 17.1) lets owners approve a renewable installation, shared or for a single owner, with one third of the owners representing one third of the shares. If it is for the whole building, collective self-consumption under RD 244/2019 (art. 4 and annex I) shares the production among the neighbours using coefficients that are agreed and signed.
On a flat roof facing the sea the panels usually go at a low tilt on concrete ballast, without drilling through the waterproofing. The frame is calculated for wind under the Spanish Building Code (CTE DB SE-AE) and the added weight is checked against the roof. And as the numbers below show, at 10° you lose winter but not the season.
Near the water we ask for panels with the IEC 61701 salt-mist test on their datasheet and stainless fixings. On the seafront the protection easement of the Coastal Act (Ley 22/1988) also applies: 100 m from the shoreline, reduced to 20 m where the land was already urban when the Act came into force in 1988. In buildings put up with a licence before the Act that fall inside it, repair, improvement and modernisation works are allowed as long as they don't increase volume, height or floor area. And beyond Son Bauló begins the public estate of Son Real, which since 2023 has been part of the Llevant Peninsula natural park: on that edge, before designing we check what kind of land it is.
In numbers
According to PVGIS, the European Commission's tool (a typical year calculated from satellite data, not a measurement; queried on 1 October 2026, facing south, 14 % losses), each kWp in Can Picafort yields about 1,525 kWh a year with the panels at 35° and about 1,412 kWh at 10°, which is how they usually sit on a flat roof with ballast: 7 % less over the year.
But that 7 % is lost in winter. From May to October, each kWp yields 866 kWh at 35° and 873 kWh at 10°: the same. From November to February, 384 against 283. For a building that fills up in season, panels lying almost flat produce just as much when it's needed, catch less wind and can't be seen from the street.
The saving lies in what is used while the sun is producing: air conditioning, kitchens, laundry, the pool's filtration system. That's why we ask for the bills for the whole year, including the months when the building is shut.
Grants
IBI (property tax): Can Picafort is part of the municipality of Santa Margalida, whose bylaw brought in a rebate for solar panels of between 10 % and 50 % depending on capacity in 2022, for 3 periods (art. 15.6, BOIB no. 122 of 17-09-2022). However, BOIB no. 170 of 28-12-2024 gave that section 6 a new wording, now a 5 % rebate for paying in instalments that no longer mentions solar panels, and the latest published amendment (BOIB no. 164 of 13-12-2025) only changes the tax rates. On the text published today we don't take the IBI rebate for granted: we confirm it with the town hall before you count on it.
ICIO (construction tax): 95 % of the tax on the cost of the solar part (art. 5.3, BOIB no. 186 of 13-12-2011).
FOTOPAR 2027 opens from 26 January to 30 April 2027 (the 2026 call closed on 30 April); you must apply before the work starts and it requires domicile in the Balearic Islands: with a second home you normally won't qualify. The FACTOR 2026 call for batteries closed on 17 October 2026 when the funds ran out (BOIB no. 132, 17 October 2026). A hotel or a business goes through other schemes: we'll tell you which one applies.
If it is paid for and finished in 2026, the income-tax (IRPF) deduction for self-consumption (62nd additional provision of the Income Tax Act, Ley 35/2006) is 10 % (up to €500), or 20 % (up to €1,000) if the installation is on a residential building. Income-tax (IRPF) deductions are claimed by you in your Spanish tax return, using the invoices and the installation certificate we hand over. For the energy-efficiency deduction, the two energy performance certificates (one before and one after the works) are signed by a qualified technician and, if you wish, we arrange them for you.
We prepare the paperwork and, with your authorisation, file and justify the grant; you sign the application and the grant is paid into your bank account. The authorities decide whether it is awarded.
Every grant, with dates and BOIB source: renewable energy grants in Mallorca →
Sources: BOIB no. 83, 2 July 2026, and no. 132, 17 October 2026 (FACTOR 2026, closed) · BOIB no. 171, 25 December 2025 (FOTOPAR 2027) · municipal tax bylaws published in the BOIB · PVGIS (European Commission), queried on 1 October 2026 · the Acts cited, in their consolidated text in the BOE.
How we work
With the year's electricity bills and photos of the flat roof we work out how many panels fit, what they would produce from May to October according to PVGIS and how much weight they add to the roof.
If it's an owners' association, we prepare the proposal for the owners' meeting. Then a ballasted frame calculated for wind, materials for a marine environment and legalisation of the self-consumption system (RD 244/2019).
We prepare the paperwork for the ICIO and for Santa Margalida's IBI rebate, which you apply for within 3 months, and, with your authorisation, whichever grant is open.
Keep learning
Heat pumps or air conditioning in Can Picafort, or the general guide? Here they are.
How self-consumption, batteries and payback work, in detail.
See the full guide →Heating, hot water and fan coils from one air-to-water heat pump.
See heat pumps in Can Picafort →Split, multi-split or ducted, with the outdoor unit in the right place.
See air conditioning in Can Picafort →Across Mallorca
Solar panels near Can Picafort: Santa Margalida · Port d'Alcúdia · Muro · Artà, or see the full guide to solar panels in Mallorca →
See our work and customer reviews on the JSL Google Maps profile →
Common questions
According to the typical year calculated by PVGIS (European Commission, queried on 1 October 2026), in Can Picafort each kWp yields about 1,412 kWh a year with the panels at 10°, against 1,525 kWh at 35°: 7 % less. The difference is in winter: from May to October they give 873 and 866 kWh, practically the same. In a seasonal building, the low tilt costs no production while it's open.
Yes. In a Can Picafort building, the votes of one third of the owners representing one third of the shares are enough to approve a renewable installation, shared or private (Spain's Horizontal Property Act, art. 17.1). If it is collective, RD 244/2019 (art. 4 and annex I) allows the energy to be shared among the neighbours with agreed coefficients. We prepare the figures per flat for the owners' meeting.
Santa Margalida's, which is its town hall. In 2022 it brought in a rebate for solar panels of between 10 % and 50 % depending on capacity (art. 15.6, BOIB no. 122 of 17-09-2022), but BOIB no. 170 of 28-12-2024 gave that section a new wording (5 % for paying in instalments) that no longer mentions solar panels. Today we don't take it for granted: in Can Picafort we confirm it with the town hall before you count on it.
They fit well, because in Can Picafort production and occupancy coincide: according to PVGIS, from May to October one kWp yields about 870 kWh, 57 % of the year with panels at 35° and 62 % with panels at 10°. The FOTOPAR grant is for private individuals' homes, so a hotel goes through other schemes. We look at your hour-by-hour consumption curve before saying how many panels.
The Coastal Act (Ley 22/1988) sets a protection easement of 100 m from the shoreline (art. 23.1), reduced to 20 m where the land was already urban when the Act came into force in 1988 (third transitional provision). In buildings put up with a licence before the Act that fall inside it, repair, improvement, consolidation and modernisation works are allowed as long as they don't increase volume, height or floor area (fourth transitional provision), under the conditions it sets, including better energy efficiency. Every building is its own case: with the address or the cadastral reference we check which zone it falls in before designing.
Yes, if they're chosen for it. The IEC 61701 standard tests modules in salt mist; LONGi, for example, publishes for its Hi-MO 6 a 1,000-hour test in 5 % salt-water mist at 35 °C. In Can Picafort we add stainless fixings and a frame calculated for wind (CTE DB SE-AE), and we read in each manufacturer's manual how close to the sea the warranty still applies.
Quality
We work with every brand; on the coast, for example, LONGi or JA Solar panels with Huawei or Fronius inverters and BYD batteries, always checking their datasheet for marine environments.




Send us the year's electricity bills and photos of the roof. Itemised quote.