Charging in Mallorca: at home and on the public network
Day to day, the easiest place to charge an electric car is where it spends the night: in the garage or on the driveway at home. That calls for a proper charging point, installed to the low-voltage instruction for EV charging (ITC-BT-52, Royal Decree 1053/2014), on its own circuit with its own protections. That is our job: we look at your consumer unit and the power you have contracted, install the charger in your house or garage and register the certificate with Industry.
And it shows in your wallet: under the IDAE methodology (19 May 2025), a reference electric car uses 16.3 kWh per 100 km, while an average combustion car uses the equivalent of 49.9 kWh (5.4 l/100 km of petrol or 5.3 of diesel). That is a little over a third of the energy to cover the same distance. For your own sums: multiply 16.3 by what a kWh costs you at home and compare it with the litres you burn today (source: IDAE, Spain's energy agency, in Spanish).
On the road, Mallorca also has public charging points. To find them, use the official REVE map from the Spanish Ministry for the Ecological Transition (MITECO), developed by Red Eléctrica: it shows where each public point is, its power and connector, whether it is free or in use and what it costs, and it has an app with a route planner.
Charge without increasing your contracted power
A 7.4 kW wallbox asks for more power than most homes have contracted, and raising it is paid every month in the fixed part of the bill. The answer isn't to contract more: it's a charger with dynamic load management. It measures what the rest of the house is using and turns the car down while the oven or the heat pump are running. The car still charges, a little slower for that while, and you don't pay a higher fixed power charge. We install it that way by default.
With solar panels and a battery: who gets each kilowatt first
When the charger shares a home with a solar installation, plugging the car in is not enough: you have to decide who gets each kilowatt first. The order we set up is:
- The house: fridge, heat pump, cooker, whatever is running at that moment.
- The battery, if there is one: it charges with what the house leaves over.
- The car: it gets the surplus that neither the house nor the battery needs.
- The grid: supplies what is missing, and only what is missing.
This is a starting order, not a rule: it is adjusted to your routine (for example, if the car must be charged before a given time, the car gets priority). We agree it with you before leaving it configured.
Dynamic power balancing
Dynamic balancing is what makes all of this possible without raising your contracted power. A measuring clamp in the electrical panel reads, second by second, what the rest of the house is using; the charger splits the power that is left between the car and the home. If you switch the oven on, the car charges more slowly for a few minutes; when you switch it off, it speeds up again. The car ends up just as charged and the main breaker does not trip.
Shared garage: individual point or collective pre-installation
There are two ways to do it, and the owners' meeting usually arrives not knowing which applies:
- An individual point with its own line from your meter to your space. That's what the law lets you do by simply notifying the community. It works if you're the first or one of a few.
- Collective pre-installation: a trunk conduit through the garage, paid by the community, which each owner connects their charger to whenever they want. More on day one, far less per space afterwards.
We explain it with the garage plan in front of us and prepare the paperwork for the meeting.
What a serious charger quote has to include
If you're given a price in two lines, be wary. What we itemise: the unit and its power; the line with its cable section and its own protections (the ITC-BT-52 requires a dedicated circuit); labour and civil works if a trench or a façade run is needed; the certificate and registration with Industry, which is what makes the installation legal; and the study of your contracted power, which decides whether load management is needed.
Businesses, fleets and hotels
One charging point for hotel guests, four for a company fleet or a pre-installation for the car park: the power changes, so does user management, and above a certain power a project and an initial inspection by a control body are required. We size it, register it and leave it working; as a licensed low-voltage installer, we sign what we install.