Solar panels in Mallorca
How self-consumption, batteries and payback work, in detail.
See the full guide →Solar panels · Port de Pollença
Port de Pollença (Puerto Pollensa) is about six kilometres from the town, at the northern end of the bay, with the Serra de Tramuntana behind it and Formentor next door. We install solar panels and self-consumption systems, with or without batteries, on villas, apartments and businesses in the Port. We are an authorised low-voltage electrical installer: survey, installation, legalisation and paperwork, with no middlemen.
Send us photos and details · Reply within 24-48 hours on working days · We assist you in English, Spanish and German
Image: LONGi
Your area
Here the installation is decided by three things that matter less in the town: the wind, the salt and what lies next to the house. On one side the protected mountains begin, on the other a nature reserve.
The Port is open to the bay and takes the north wind full on. The frame is calculated for wind under the Spanish Building Code (CTE DB SE-AE), the fixings are stainless and the panels have the IEC 61701 salt-mist test on their datasheet. In the buildings along the promenade the protection easement of the Coastal Act (Ley 22/1988) also counts: in those put up with a licence before 1988 that fall inside it, improvement works are allowed as long as they don't increase volume, height or floor area.
Leaving the Port to the north you enter the Serra de Tramuntana Natural Area (Paraje Natural), with its management plan (Decree 19/2007), within the landscape UNESCO inscribed in 2011. A house there is usually on protected rural land: before designing we check what its rules allow and, if it can be done, the panels go on the roof and out of sight.
On the other side, between the Port and Alcúdia, lies the s'Albufereta nature reserve (Decree 121/2001). In the developments along that stretch of the bay the house is usually on urban land and nothing changes, but on a property bordering the reserve we check first.
In numbers
According to PVGIS (European Commission; a typical year calculated from satellite data, not a measurement; queried on 1 October 2026, 35° south, 14 % losses), each kWp yields about 1,525 kWh a year in the Port, slightly more than in Pollença town (1,511) because the mountains are further away. A 3 kWp system comes to around 4,580 kWh a year.
The worst month in the Port is November, with 88 kWh per kWp, 54 % of July (164). In Palma the worst month gives 59 %. It's the effect of the horizon: the low winter sun disappears earlier behind the mountains. Anyone who lives here all year and wants batteries has to size for November and December, not for the average.
From June to September, on the other hand, each kWp yields about 605 kWh, almost 40 % of the year: for a house that is used or let in summer, production falls where the consumption is.
Grants
IBI (property tax): the Port is part of the municipality of Pollença, whose bylaw gives a 50 % IBI rebate for up to 3 years for installing solar energy. You apply before 31 March and each year the rebate can't exceed 33 % of what the installation cost (art. 15.4, BOIB no. 175 of 28-12-2023).
ICIO (construction tax): a 75 % rebate on the solar part of the budget (art. 4.2, BOIB no. 203 of 03-12-2020).
FOTOPAR 2027 opens from 26 January to 30 April 2027 (the 2026 call closed on 30 April); you must apply before the work starts and it requires domicile in the Balearic Islands: with a second home you normally won't qualify. Batteries can go through FACTOR 2026 (45 %, open until 28 February 2027), but not both grants for the same thing.
If it is paid for and finished in 2026, the income-tax (IRPF) deduction for self-consumption (62nd additional provision of the Income Tax Act, Ley 35/2006) is 10 % (up to €500), or 20 % (up to €1,000) if the installation is on a residential building. Income-tax (IRPF) deductions are claimed by you in your Spanish tax return, using the invoices and certificates we hand over. If you pay tax as a non-resident, ask your tax adviser first.
We prepare the paperwork and, with your authorisation, file and justify the grant; you sign the application and the grant is paid into your bank account. The authorities decide whether it is awarded.
Every grant, with dates and BOIB source: renewable energy grants in Mallorca →
Sources: BOIB no. 83, 2 July 2026 (FACTOR 2026) · BOIB no. 171, 25 December 2025 (FOTOPAR 2027) · municipal tax bylaws published in the BOIB · PVGIS (European Commission), queried on 1 October 2026 · the Acts cited, in their consolidated text in the BOE.
How we work
With your bills and photos of the roof we work out what fits and what it produces according to PVGIS at your exact spot, and whether the house falls within the natural area or next to the reserve.
A frame calculated for the tramontana, materials for a marine environment and legalisation of the self-consumption system (RD 244/2019) with its electrical installation certificate.
We prepare the paperwork for Pollença's IBI and ICIO rebates and, with your authorisation, whichever grant is open.
Keep learning
Heat pumps or air conditioning in Port de Pollença, or the general guide? Here they are.
How self-consumption, batteries and payback work, in detail.
See the full guide →Heating, hot water and fan coils from one air-to-water heat pump.
See heat pumps in Port de Pollença →Split, multi-split or ducted, with the outdoor unit in the right place.
See air conditioning in Port de Pollença →Across Mallorca
Solar panels near Port de Pollença: Pollença · Port d'Alcúdia · Alcúdia, or see the full guide to solar panels in Mallorca →
See our work and customer reviews on the JSL Google Maps profile →
Common questions
Over the year, hardly: according to the typical year calculated by PVGIS (European Commission, queried on 1 October 2026), 1,525 kWh per kWp in Port de Pollença against 1,572 in Palma, 3 % less. The difference is in winter: the worst month, November, gives 88 kWh per kWp, 54 % of July, whereas in Palma the worst month gives 59 %. The Serra de Tramuntana blocks the low sun. It is offset by choosing the roof slope and the spot on the roof.
It depends on exactly where it falls. North of Port de Pollença the Serra de Tramuntana Natural Area (Paraje Natural) begins, regulated by Decree 19/2007, and there the land is usually protected rural land: the first thing is to see what its plan allows on your plot. On the roof of a legal house and out of sight is the easiest to fit in. We check before giving you a quote.
Yes, if it's calculated for it. In Port de Pollença the frame is sized for wind under the Spanish Building Code (CTE DB SE-AE), with panels flush or very low on a flat roof, stainless fixings and modules with the IEC 61701 salt-mist test. We also read the manufacturer's manual, which says how many fixing points it requires and how close to the sea the warranty still applies.
Pollença's: 50 % of the IBI for up to 3 years, applied for before 31 March, with each year's rebate not exceeding 33 % of the installation cost (art. 15.4, BOIB no. 175 of 28-12-2023). The construction tax (ICIO) also has a 75 % rebate on the solar part (BOIB no. 203 of 03-12-2020). It applies in the Port just as in the town.
FOTOPAR 2027 opens from 26 January to 30 April 2027 (BOIB no. 171 of 25-12-2025) and requires domicile in the Balearic Islands, so with a holiday home in Port de Pollença you normally won't qualify. Pollença's IBI rebate, on the other hand, goes with the home. And from June to September one kWp yields about 605 kWh according to PVGIS, almost 40 % of the year.
It can be, if it's sized for the weak months. In Port de Pollença November and December give about 88 kWh per kWp according to PVGIS, little more than half of July (164). A battery calculated from the yearly average falls short just then. We look at your winter bills and, if you live here, the battery can go through FACTOR 2026 (45 %, until 28 February 2027).
Quality
We work with every brand; for example LONGi or JA Solar panels, Fronius or Huawei inverters and BYD batteries, checking their datasheet for marine environments and wind load.




Send us an electricity bill, photos of the roof and the address. Itemised quote.